Design, construction and operation of Torrejón de Ardoz WWTP.
The WWTP is located in the municipality of Torrejón de Ardoz, in the basin of the Jarama River. This WWTP treats a flow rate of 75.000 m3/day with a load of 450.000 equivalent inhabitants. The wastewater comes from Torrejón de Ardoz

The treatment process consists of: 

  • Pretreatment
  • Primary decanting
  • Biological treatment
  • Tertiary treatment; sand and UV filters
  • Treatment of sludge by gravity thickener (primary sludge), flotation thickener (secondary sludge), anaerobic digestion and centrifugal dehydration

75,000

Treated volume (m3/d)

4 years

Contract period

50%

Sacyr's participation